Search Axens.net
C₅-C₆ Isomerization

Technical Article - Isomerisation: opportunities for a more sustainable refining industry

Technical Article - Ras Tanura: The Creation Of a Clean-Fuels Complex

Technical Article - Paraffins Isomerization Options

Technical Article - Advanced Solutions for Paraffins Isomerization

Commercial Bulletin - Isomerization

How to Achieve Gasoline Pool Octane Requirement and Boost Light Cut Naphtha Contribution with an Environmental-friendly Process?
Testimony - The start-up went very smoothly in 2019
Testimony - The start-up went very smoothly in 2019
The start-up went very smoothly in 2019, even when the feed flowrate fluctuated between 65% to 105% of the design flowrate. Axens process design is quite robust to face possible start-up and operating troubles. After a week of operation the temperatures were adjusted as per design to 113°C and 120°C for First and Second Reactors respectively. The isomerate RON was above 88, up to 89.2 sometimes, according to our laboratory.
HCl Absorber efficiency was high. C2Cl4 injection was gradually decreased to minimum recommended ratio of Cl/feed but HCl concentration detected in Stabilizer off-gas was still above 5000 ppm.
Currently we are still very satisfied with Axens ISOM technology and ATIS-2L catalyst. Thanks to the HCl recovery innovation we save 75% of chemicals, and earn 1% isomerate yield more.

Testimony - Axens and Qirun staff worked jointly very satisfactorily to start-up
Testimony - Axens and Qirun staff worked jointly very satisfactorily to start-up
The unit has been started-up within 6 weeks. Reactors were oiled-in one by one (R-202 on January 2nd and R-203 on January 4th 2019). Then HCl absorber was put in service on January 7th. With HCl absorber, C2Cl4 flow rate was decreased, while HCl content in Stabilizer off-gas remains higher than 3000 ppm.
We believe Chemicals consumption could be saved by more than 75%, but we are currently limited by the minimum turndown flowrate of the selected chloriding agent pump.
Axens and Qirun staff worked jointly very satisfactorily to start-up, operate and follow successfully the unit.
